Roadway Projects

12/12/2022 Another retaining wall is scheduled to be constructed between addresses 1479 and 1485 South Lake Road. The current start date is 12/12/2022 and should be completed by the end of the following week. There is a road closure sign posted at the beginning of South Lake Road. During this period, all non-emergency traffic will be prohibited south of address 1479. The road will be closed 6 am through 6 pm each day, except Sunday, then reopened for the evening after 6 pm. All residents south of this location should adjust their schedules accordingly and alert any contractor or service company as well. Questions can be directed to Bruce St. Lawrence at 585-746-4703.

12/21/2022 The retaining wall cited above has now been completed. Temporary roadside barriers will be left in place until this Spring at which time guiderail will be installed.